|
Gas Process Operations
Level C - Plant Processes
In cooperation with Red Deer College, YREC is pleased to offer the Gas Process operation program in Edson.
The Gas Process Operations program provides training to plant operators working in the industry. The program consists of four levels of training - A, B, C, and D.
The objectives of the Gas Process Operations Program are twofold:
- To supplement on-the-job training with technical knowledge about gas processes as well as knowledge of the underlying concepts, basic background, and plant safety.
- To give gas plant operators the opportunity to obtain an industry-recognized certificate, certifying four levels of knowledge.
Starting this January:
Level C - Plant Processes
This level provides a study of the various processes raw oil and gas must go through in order to produce saleable products. The course studies the processes required by a typical Western Canadian Gas Plant with 'sour gas. There are a total of 33 modules which are listed on the following page.
COURSE: GPO Level C, CRN 2010
DATES: January 16 & 17, January 30 & 31, February 13 & 14 and February 27, 2009
TIMES: Friday's (6:30 pm to 9:30 pm) and Saturdays (9:00 am to 4:00 pm)
FEES: $910.00 includes text
PLACE: YREC, Edson (Provincial Building, Edson)
The registration deadline for this program is Wednesday, January 14, 2008.
TO REGISTER:
Students can register online at:
www.red.ab.ca/continuingeducation/industrial_and_trades_training/index.html
OR
by phone directly with RDC by calling 403-357-3663.
Applicants must remember to select the GPO Level C, CRN 2010 course being held in Edson. YREC staff can assist students in registering with either of these two methods.
For more information, please contact YREC in Edson at 780-723-5206 or Hinton at 780-865-7666.
Gas Process Operations - Level C
Level C - Plant Processes
Module Name
|
Number
|
| Gas Plant - Developments and Types |
027-31-38-02 |
| Gas Plant - Process Description |
027-31-38-04 |
Gas Plant - Process Flows
|
027-31-38-06 |
Gas Plant - Inlet Separation
|
027-31-38-08 |
Gas Plant - Inlet Equipment and Operations
|
027-31-38-10 |
Condensate Stabilization Systems
|
027-31-38-12 |
| Stabilization Equipment |
027-31-38-14 |
Stabilization Operations
|
027-31-38-16 |
Sweetening Processes
|
027-31-38-18 |
Sweetening Chemicals
|
027-31-38-20 |
| Sweetening Equipment |
027-31-38-22 |
Sweetening Operations
|
027-31-38-24 |
Sulfur - Introduction
|
027-31-38-26
|
Sulfur - Claus Process
|
027-31-38-28 |
Sulfur Processing Methods
|
027-31-38-30 |
Sulfur - Process Control
|
027-31-38-32 |
Sulfur - Plant Operations
|
027-31-38-34 |
Sulfur Plant Tail Gas Cleanup
|
027-31-38-35 |
Dehydration - Definitions, Testing
|
027-31-38-36 |
Dehydration - Chemicals, Liquid Desiccants
|
027-31-38-38 |
Dehydration -Glycol Equipment & Operations
|
027-31-38-40 |
Dehydration - Solid Desiccants
|
027-31-38-42 |
Refrigeration - External Processes
|
027-31-52-02 |
Refrigeration - Cryogenic Process
|
027-31-52-04
|
| Introduction to Fractionation |
027-31-87-02 |
| Fractionation - Tower & Tray Design |
027-31-87-04 |
| Fractionation - Equipment |
027-31-87-06 |
| Fractionation - Systems |
027-31-87-08 |
| Fractionation - Operational Procedures |
027-31-93-20 |
| Hydrocarbon Treating - Caustic Systems |
027-31-97-10 |
| Hydrocarbon Treating - Molecular Sieve Process |
027-31-97-12 |
| Hydrocarbons Storage and Loading |
027-31-97-14 |
Gas Compression - Drivers, Operational Controls
|
027-31-50-18 |
-
-
|